PDC Attach Sequence

Return to PDC documentation

A generic call flow for when a device is plugged into PDC port to illustrate the communication between PDC, DRIVER, and Power Management modules.

Note: Between step 9 and 13, the connector status is NOT valid yet, as the driver has not populated the structure until step 13. Power Mgmt is not informed of this until step 15. PDC Attach Sequence